Investigating the Synergy of Integrated Project Delivery and Building Information Modeling in the Conservation of the Architectural Heritage

Authors

DOI:

https://doi.org/10.25034/ijcua.2018.4720

Keywords:

Integrated Project Delivery, Building Information Modeling, construction management, architectural heritage conservation

Abstract

Architectural heritage conservation projects are one of the most risky and complex projects in the construction industry. Many studies have reported frequent performance failures in terms of time, cost and quality. To implement quality management in the conservation projects and enhance their performance; we propose the adoption of two emerging and innovative approaches: Integrated Project Delivery (IPD) and Building Information Modeling (BIM). Through an analysis of literature review (journals, white papers, norms and standards) on the subject, a comprehensive qualitative study in theoretical term has been carried out to define the potential advantages of the synergy between the BIM and IPD to face conservation issues and constraints through project lifecycle. Finally, we draw some general conclusions, summarize the implications for practice and set out recommendations for further research.

Downloads

Download data is not yet available.

References

AIA. (2007). Integrated Project Delivery: A Guide. Version 1, California, United states. http://info.aia.org/siteobjects/files/ipd_guide_2007.pdf

Angelini, M. G., Baiocchi, V., Costantino, D., & Garzia, F. (2017). Scan to Bim for 3d Reconstruction of the Papal Basilica of Saint Francis in Assisi in Italy. The International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences, XLII-5/W1, 47-54. http://dx.doi.org/10.5194/isprs-archives-XLII-5-W1-47-2017

Arayici, Y., Counsell, J., Mahdjoubi, L., Nagy, G., Hawas, S., & Dewidar, K. (2017). Heritage building information modeling. New York : Routledge, , John Edwards. It’s BIM-but not as we know it!

Attenni, M., Bartolomei, C., Inglese, C., Ippolito, A., Morganti, C., & Predari, G. (2017). Low Cost Survey and Heritage Value. Scientific research and Information Technology, 7 (2), 115-132.

Azizia, N. Z. M., Razaka. A. A., Dinb, M. A.M., Nasir, N. M. (2016). Recurring Issues in Historic Building Conservation. Procedia - Social and Behavioral Sciences, 222, 587 – 595. https://doi.org/10.1016/j.sbspro.2016.05.217

Azhara, N., Kanga, Y., & Ahmad, I.U. (2014). Factors Influencing Integrated Project Delivery In Publicly Owned Construction Projects: An Information Modelling Perspective, Procedia Engineering, 77, 213 – 221. https://doi.org/10.1016/j.proeng.2014.07.019

Bahmani, H. (2017). Describing the Role of Building Information Modelling and Integrated Project Delivery in Iran Construction Projects and Their Role to Solve Conventional Problems of Construction Industry. International Journals of Advanced Research in Computer Science and Software Engineering, 7(6), 576-587. DOI: 10.23956/ijarcsse/V7I6/01618

Barbosa, M.J., Pauwels, P., Ferreira, V., & Mateus, L. (2016). Towards increased BIM usage for existing building interventions. Structural Survey, 34 (2), 168-190. https://doi.org/10.1108/SS-01-2015-0002

Becerik-Gerber, B., DDes and David, K. ( 2012). Implementation of Integrated Project Delivery and Building Information Modeling on a Small Commercial Project. University of southern California . united states.

Binan, C. Ş., & Sipahioğlu, E. T. (2015). A survey on the efficiency and safety of the temporary cover systems in architectural conservation and restoration works. The Built Environment, 53, 643- 654. https://www.witpress.com/Secure/elibrary/papers/STR15/STR15054FU1.pdf

Bradley, A., Li, H., Lark, R., Dunn, S., (2016). BIM for infrastructure: An overall review and constructor perspective. Automation in Construction, 71 (2), 139–152. https://doi.org/10.1016/j.autcon.2016.08.019

Bryde, D., Broquetas, M., & Volm, J .M. (2013). The project benefits of Building Information Modelling (BIM), International Journal of Project Management, 31 (7), 971-980 https://doi.org/10.1016/j.ijproman.2012.12.001

Cerovsek, T. (2011). A review and outlook for a ‘Building Information Model’(BIM): a multi standpoint framework for technological development. Advanced Engineering Informatics, 25 (2), 224–244. https://doi.org/10.1016/j.aei.2010.06.003

Cheng, H.M, Yang W.B, & Yen, Y.N. (2015). BIM applied in historical building documentation and refurbishing. The International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences, XL-5/W7, pp.85-90. doi:10.5194/isprsarchives-XL-5-W7-85-2015

Cohen, F. (2010). Integrated Project Delivery: Case Studies. California Council in partnership with AIA, 1303 J Street, Suite 200, Sacramento, CA 95814. https://www.ipda.ca/site/assets/files/1111/aia-2010-ipd-case-studies.pdf

Dodgson, M. (2000). The management of technological innovation: an international and strategic approach, oxford university press,166 https://www.amazon.com/Management-Technological-Innovation-International-Strategic/dp/0198775350

Eastman, C. M., Teicholz, P., Sacks, R., and Liston, K. (2008). BIM handbook: A guide to building information modeling for owners, managers, architects, engineers, contractors, and fabricators. Wiley, Hoboken, N.J.

El-adaway, I., Abotaleb, I., & Eteifa, S. (2017). Framework for Multiparty Relational Contracting. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 9 (3), 04517018-1- 04517018-19. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000238

El Asmar, M., Hanna, A.S., & Loh, W.Y.(2013). Quantifying Performance for the Integrated Project Delivery System as Compared to Established Delivery Systems. journal of Construction Engineering and Management. 139 (11). https://doi.org/10.1061/(ASCE)CO.1943-7862.0000744

Fischer, M., Ashcraft, H., Reed, D., & Khanzode, A. (2017). Integrating Project Delivery. Hoboken: NJ: Wiley & Sons, Inc. https://www.wiley.com/en-us/Integrating+Project+Delivery+-p-9781118415382

Fischer, M., Reed, D., Khanzode, D. A., & Ashcraft, H. (2014). A simple framework for Integrated Project Delivery. In: IGLC22, 25-27 June 2014, Oslo, Norway, 22, 1319-1330.

Garagnani,S., Manferdini. A.M. (2013). Parametric accuracy: Building information modeling process applied to the cultural heritage preservation. International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences, XL-5/W1, 2013. DOI : 10.5194/isprsarchives-XL-5-W1-87-2013

Ghassemi, R., Becerik-Gerber, B. (2011). Transitioning to integrated project delivery: Potential barriers and lessons learned. Lean and Integrated Project Delivery Special issue, Construction Journal, 32-52. www.leanconstructionjournal.org

Gigrliarelli, E., Calcerano, F.,& Cessari, L. (2017). Heritage BIM, Numerical Simulation and Decision Support Systems: an Integrated Approche for Historical Buildings Retrofits. Energy Procedia 133, 135–144. https://doi.org/10.1016/j.egypro.2017.09.379

Hamdi, O., & Leite, F. (2014). Conflicting Side of Building Information Modeling Implementation in the Construction Industry. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 6 (3), 03013004-1 - 03013004-8. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000137

Hanna, A. S. (2016). Benchmark performance metrics for integrated project delivery. Journal of Civil Engineering and Management, 142 (9), 1-9. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001151

Harun, S. N. (2011). Heritage Building Conservation in Malaysia: Experience and Challenges. Procedia Engineering, 20, 41–53. https://doi.org/10.1016/j.proeng.2011.11.137

Historic England (2017). BIM for Heritage: Developing a Historic Building Information Model. Swindon. Historic England. Hoboken: NJ: Wiley & Sons, Inc.

Ilozor, B.D., & Kelly, D.J. (2012). Building Information Modeling and Integrated Project Delivery in the Commercial Construction Industry: A Conceptual Study. Journal of Engineering, Project, and Production Management, 2(1), 23-36. https://core.ac.uk/download/pdf/25723405.pdf

Joblot, L., Paviot, T., Deneux, D., & Lamouri, S. (2017). Literature review of Building Information Modeling (BIM) intended for the purpose of renovation projects. International Federation of Automatic Control, 50 (1), 10518–10525. https://doi.org/10.1016/j.ifacol.2017.08.1298

Kassem, M., Iqbal, N., Kelly, G., Lockley, S., & Dawood, N. (2014). Building information modelling: protocols for collaborative design processes. Journal of Information Technology in Construction, 19, 126-149. https://www.itcon.org/paper/2014/7

Kent, D., Becerik-Gerber, B. (2010). Understanding Construction Industry Experience and Attitudes toward Integrated Project Delivery, Journal of Construction Engineering and Management, 136 (8), 815-825. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000188

Khodeir, L. (2015). Green BIM in heritage building; integrating building energy Models (BEM) with building information modelling (BIM) for sustainable retrofit of heritage buildings. 25th International CIPA Symposium 2015, 31 August – 04 September 2015, Taipei, Taiwan. DOI :10.4324/9781315628011

Kim, Y.W., & Dossick, C.S. (2011). What Makes the Delivery of a Project Integrated? A case of study of Children’s Hospital, Bellevue, WA. Lean construction journal, lean and integrated project delivery special issue, 53-66.

Kiani, I., Ghomi, S. K., Alerasoul, S., & Khoshnava, S. M. (2013). The barriers and implementation of building information modelling (BIM) based on integrated project delivery in construction industry. Conference: IGCESH 2013, Malaysia.

Konchar, M., Sanvido, V. (1998). Comparison of U.S. project delivery systems. Journal of Construction Engineering and Management, 124, 435–444. https://doi.org/10.1061/(ASCE)0733-9364(1998)124:6(435)

KPMG. (2013). Integrated project delivery: Managing risk and making it work for all parties. KPMG.

Larson, D. A., & Golden, K. A. (2007). Entering the Brave, New World: An Introduction to Contracting for Building Information Modeling. William Mitchell Law Review, 34 (1) (8). https://open.mitchellhamline.edu/wmlr/vol34/iss1/8/

Lee, A., Betts, M., Aouad, G., Cooper, R., Wu, S., & Underwood, J. (2002). Developing a vision for an nD modelling tool. CIB w78 Conference Proceedings – Distributing Knowledge in Building. 12-14 June 2002, Aarhus, Denmark. http://itc.scix.net/data/works/att/w78-2002-102.content.pdf

Lin,Y.C. (2015). Use of BIM approach to enhance construction interface management: A Case Study, Journal of Civil Engineering and Management, 21(2), 201–217. DOI 10.3846/13923730.2013.802730

Logothetis, S., Delinasiou, A., & Stylianidis, E. (2015). Building Information Modelling for Cultural Heritage: A Review. ISPRS Annals of the Photogrammetry, Remote Sensing and Spatial Information Sciences, Volume II-5/W3.doi:10.5194/isprsannals-II-5-W3-177-2015

Migilinskasa, D., Popovb, V., Juoceviciusc, V.,& Gediminas, L.U.V. ( 2013 ) . The Benefits, Obstacles and Problems of Practical BIM Implementation. Procedia Engineering, 57, 767 – 774. https://doi.org/10.1016/j.proeng.2013.04.097

NASFA, COAA, APPA, AGC, & AIA. (2010). Integrated Project Delivery For Public and Private Owners. White Paper.

Neve, H. H, Wandahl, S., Kaeseler, S. M., & Tandrup, A. (2017). Integrating IPD and Exploring Potentials. Proceeding of the 33rd Annual ARCOM Conference, 4-6 September 2017, 154-163. http://revalue.dk/wp-content/uploads/2016/03/Neve-published.pdf

Parn, E.A., Edwards, D.J., & Sing, M.C.P. (2017). The building information modelling trajectory in facilities management: A review. Automation in Construction, 75, 45–55. https://doi.org/10.1016/j.autcon.2016.12.003

Patiño, F., Prieto, J., Brodeschi, M., & Fenollera. M. (2012). Integrated Project Delivery Applied to the Rehabilitation of Ethnographic Buildings. Proceedings of the 2012 Industrial and Systems Engineering Research Conference G. Lim and J.W. Herrmann, eds. http://toc.proceedings.com/21943webtoc.pdf

Penttila, H., Rajala, M., Freese, S. (2007). Building Information modelling of modern historic buildings, eCAADe 2007, 607– 613.

Reyers, J., & Mansfield, J. (2001). The assessment of risk in conservation refurbishment projects. Structural Survey, 19 (5), 238 – 244. https://doi.org/10.1108/02630800110412480

Rowlinson, S. (2017). Building information modelling, integrated project delivery and all that .Construction Innovation, 17 (1), 45-49. https://doi.org/10.1108/CI-05-2016-0025

Roy, D., Kalidindi, S.N. (2017) . Critical challenges in management of heritage conservation projects in India. Journal of Cultural Heritage Management and Sustainable Development, 7 (3), 290-307. DOI: 10.1108/JCHMSD-03-2017-0012

Sacks, R., Koskela, L.J., Dave, B., & Owen, R. (2010). The interaction of lean and building information modeling in construction. Journal of Construction Engineering and Management, 136 (9), 968-980. http://dx.doi.org/10.1061/(ASCE)CO.19437862.0000203

Shendkar, P.D. (2017). Study of Integrated Project Delivery (IPD) using Building Information Modeling (BIM). International Journal for Scientific Research & Development, 5 (01), 1731-1736.

Shou, W., Wang, J., Wang, X., Chong, H.Y. (2015). A Comparative Review of Building Information Modelling Implementation in Building and Infrastructure Industries. Archives of Computational Methods in Engineering , 22(2), 291–308. DOI: 10.1007/s11831-014-9125-9

Simeone, D., Cursi, S., Toldo, I., & Carrara, G. (2014). BIM and Knowledge Management for Building Heritage. ACADIA 14: Design Agency [Proceedings of the 34th Annual Conference of the Association for Computer Aided Design in Architecture (ACADIA), At Los Angeles

Sive, T., Hays, M. (2009). Integrated Project Delivery: Reality and Promise, A Strategist’s Guide to Understanding and Marketing IPD; Society for Marketing Professional Services Foundation White Paper on IPD. Washington. http://www.tedsive.com/docs/Sive_White_Paper_IPD.pdf

Succar, B. (2009). Building information modelling framework: a research and delivery foundation for industry stakeholders. Automation Construction, 18 (3), 357–375. https://doi.org/10.1016/j.autcon.2008.10.003

Syahrul, N. K., Emma, A. Z., & Aiman, O. (2011). Preliminary evaluation of problems involved in maintaining heritage buildings in Malaysia. The Professional Journal of the Institution of Surveyors, Malaysia, 40(1), 1-9. http://repository.um.edu.my/11151/1/surveyor_46_1_published.pdf

Tommasi, C., Achille, C.,& Fassi, F. (2016). From Point Cloud to Bim: A Modelling Challenge in the Cultural Heritage field. The International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences, Volume XLI-B5. doi:10.5194/isprsarchives-XLI-B5-429-2016

Volk, R., Stengel, J., & Schultmann, F. (2014). Building information modeling (BIM) for existing buildings—literature review and future needs. Automation Construction, 38, 109–127. https://doi.org/10.1016/j.autcon.2013.10.023

Shou,W., Wang, J., Wang, X., Chong, H.Y. (2015). A Comparative Review of Building Information Modelling Implementation in Building and Infrastructure Industries. Archives of Computational Methods in Engineering , 22 (2), 291–308.

Xie, X.,& Liu, H. (2017). Studying Contract Provisions of Shared Responsibilities for Integrated Project Delivery under National and International Standard Forms. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 9 (3), 04517009-1- 04517009-11. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000220

Yee, L.S., Saar, C.C., Yusof, A.M., Chuing, L.S., & Chong, H.Y. (2017). An Empirical Review of Integrated Project Delivery (IPD) System. International Journal of Innovation, Management and Technology, 8 (1), 1-8,( consulté le 14/09/2017) . doi: 10.18178/ijimt.2017.8.1.693

Zhao,X. (2017). A scientometric review of global BIM research: Analysis and visualization. Automation in Construction, 80, 37–47. https://doi.org/10.1016/j.autcon.2017.04.002

Zolkafli, U. K., Zakaria, N., Yahya, Z., Ali, A.S., Akashah, F.W., Othman, M., & Hock, Y.K. (2012) Risks in Conservation Projects. Journal Design + Built, 5 (1).

Zhoua,Y. , Dinga, L., Raoa,Y., Luoa, H., Medjdoubb, B., & Zhongb, H. (2017). Formulating project-level building information modeling evaluation framework from the perspectives of organizations: A review. Automation in Construction, 81, 44–55. https://doi.org/10.1016/j.autcon.2017.05.004

Downloads

Published

2018-12-29

How to Cite

FERIEL, B. B., ILHAM, K., & SOUAD, S. B. (2018). Investigating the Synergy of Integrated Project Delivery and Building Information Modeling in the Conservation of the Architectural Heritage. Journal of Contemporary Urban Affairs, 2(3), 67–77. https://doi.org/10.25034/ijcua.2018.4720